As you can see, pretty bare and stark. Doorway in the middle of one wall and a large gap in the corner of the other. It took me a couple of nights to strip off all the plasterboard off one wall, remove the shelves I had on the other side of the wall and rehouse everything temporarily. With all that done it looked like this
I then pulled that framing apart and redid everything so it looks much tidier. Added a door gap to one corner, reset the nogs to hold up the shelves and even thought to add a waste pipe and hose pipe so later I can have a sink and tap in the bar. In between builds I managed to head off to work, and even shot through to Tauranga for a couple of days to put together a fence for my wife's mate.Now I have a couple days off the plan is to strip down the second (longer) wall, pull it apart and redo it so the stud and nogs patterns match the first wall, and cover in that doorway gap to make it seamless. If there is enough time (doubtful) I'll look at putting together the door framework as well.





